The visit began with Surah Al-Fatihah, followed by an introduction to the project design considerations by the Principal Architect. HSE briefing was given by HSE officer from the Main Contractor before entering the building according to the designated safety route.
Introduction to the Project by Principal Architect
Inside the building
Some of the project team
Group Photo with the UTB students
No comments:
Post a Comment